glytch/fktry/lanes
type-two dbb3615a64 [data] the composite seam + a tech tree that can actually be bought
Round 4 orders, all five.

The headline is a bug I authored: the v4 gating rule (any id in a
TechDef.unlocks is locked until that tech completes) turned three rounds of
tech authoring into a total bootstrap deadlock. Measured: melt not producible
at tick 0 (first-taste impossible), 0 of 24 techs reachable — every pack chain
gated behind packs you cannot make. disc-artifact-bottling cost 10 analog packs
and unlocked the only machine that bottles analog packs.

Fixed as a shape, not a patch, and both rules are now tests:
- the M1 melt chain is starting equipment (so first-taste is possible, and
  RENDER's era derivation correctly reads it as starting equipment)
- one pack is craftable at tick 0 — SPATIAL, made from the quantizer's own
  sins, so your first research is a study of your own damage
23/23 nodes now reachable; six emptied disc nodes deleted (no lane references
tech ids).

Also:
- §10 THE COMPOSITE SEAM transcribed: alpha/hard-matte/blue-hole/fringe-lace/
  green-spill/mixed-pixel/roto-chatter/ghost-feather/sodium-light (forward
  canon), matte bath, optical printer, chroma keyer, roto bench, neural keyer
  (powerDraw 240 — the codex's "appetite that dwarfs everything").
- ARCHAEOLOGY LAB canonized (kind: lab), ungated — a lab behind research is a
  lab you can never build.
- ASIC cooler live: the round-3 spec of 0.02 would have meant "never heats,
  free 100/s". Retuned to 0.0018, sane under both readings of the contract.
- accents where output-derivation can't work; CODEX_REF regex widened for §10.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-17 20:04:00 +10:00
..
LANE-DATA.md [data] the composite seam + a tech tree that can actually be bought 2026-07-17 20:04:00 +10:00
LANE-RENDER.md [orchestrator] round 3 review + contracts v4 + composite seam codex + round 4 orders 2026-07-17 19:43:48 +10:00
LANE-SCREEN.md [screen] round 4 notes 2026-07-17 20:01:38 +10:00
LANE-SIM.md [orchestrator] round 3 review + contracts v4 + composite seam codex + round 4 orders 2026-07-17 19:43:48 +10:00
LANE-UI.md [orchestrator] round 3 review + contracts v4 + composite seam codex + round 4 orders 2026-07-17 19:43:48 +10:00