Go to file
type-two 5500949d83 [ui] the enemy has paperwork: PARITY DEBT gauge, notices, seals + PRY, stasis
Round 7 phase 1, contracts v9. Five surfaces for The Correction's rungs 2-4:

- PARITY DEBT gauge in the top strip — five clinic-white bands, never red, never
  flashing, hidden until the debt first moves and visible forever after.
- Notices are faxes: a white-letterhead tray above the commission fax. No unit
  name, no grid reference (pinned by a test that forbids digits outright), and
  deliberately not also a toast. Compliance quotas get a COMPLIANCE stamp.
- Compliance seal panel + PRY, with the bar driven by SIM's own pry progress and
  the PROCESS bar standing down so that number can't be misread as a batch.
- Stasis: hash-named countdown chips derived from the auditor's phase progress,
  and the abstention teach in the one window where it is still actionable.
- MIRRORED joins the CORRECTED block as its own row, not the same counter.

Verified live on :8153 by driving the real sim + real UI in the browser: a full
warden cycle (seal -> PRY -> "SEAL REMOVED. THIS WILL BE NOTED." -> debt up) and a
full auditor cycle (teach -> lock 744510A8 -> countdown -> auto-release).
263 UI tests, tsc clean.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-29 12:40:06 +10:00
docs [orchestrator] round 3 review + contracts v4 + composite seam codex + round 4 orders 2026-07-17 19:43:48 +10:00
fktry [ui] the enemy has paperwork: PARITY DEBT gauge, notices, seals + PRY, stasis 2026-07-29 12:40:06 +10:00
.gitignore Baseline: GLYTCH prototype, FKTRY lore codex, scaffold + 5-lane orchestration docs 2026-07-17 15:51:12 +10:00
deploy.sh [orchestrator] round 7 phase 0: 27.3 MB -> 7.0 MB, and the build can no longer forget 2026-07-29 00:21:20 +10:00
index.html Baseline: GLYTCH prototype, FKTRY lore codex, scaffold + 5-lane orchestration docs 2026-07-17 15:51:12 +10:00
package-lock.json [orchestrator] round 1 review + contracts v2 + round 2 orders 2026-07-17 16:42:58 +10:00
package.json [orchestrator] round 1 review + contracts v2 + round 2 orders 2026-07-17 16:42:58 +10:00