PROCITY/docs
m3ultra 5671a06aef Lane C R5 C3: re-measure interiors after Lane E's hero-prop bake
E baked the 6 heavy hero props to <=8k tris (c522464). Re-measured every
interior GLB-on (cache-busted to bypass the dev browser's stale HTTP cache;
production clients fetch baked directly):
- record 43.6k tris (C3 target, ~273k pre-bake), draws 322
- milkbar 38.9k tris (was 468k — the R4 over-budget flag is now CLOSED)
- all rooms <=107k tris; book is the draw-call outlier (1245 draws from ~9
  bookshelf GLBs + ~600 primitive spines) — tris fine, interiors render
  one-at-a-time so gate 3 unaffected; instancing spines is a future lever.
Full table in docs/LANES/LANE_C_GLB_VALIDATION.md. Round 5 complete for Lane C.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-14 21:16:15 +10:00
..
LANES Lane C R5 C3: re-measure interiors after Lane E's hero-prop bake 2026-07-14 21:16:15 +10:00
shots Lane C R5 C2: crate-riffle dig behind ?dig=1 (v2) 2026-07-14 21:11:31 +10:00
A-progress.md Lane A round 4: harden openLate contract (hours>=22 ⟺ openLate == the video), confirm F2 2026-07-14 18:26:30 +10:00
CITY_SPEC.md Lane A round 3: verify F finding #5 (storeys) stale, harden selfcheck + document corner-anchor rule 2026-07-14 15:52:30 +10:00
RESEARCH.md PROCITY scaffold: spec, research, 6 Opus lane prompts, core modules, vendored three r175, 69 inherited skins 2026-07-14 10:46:40 +10:00
V2_IDEAS.md Lane F: integration — interiors + keepers + street peds + QA harness 2026-07-14 14:29:03 +10:00