festifun/plan/status
type-two fea0d5cb9e integration2: full synthetic pass of M10-M17 accepted; DIRECTIVES round 5; floor 189
Evidence in plan/status/integration2.md. v0.2.0 held for the real-footage field test.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-17 18:11:56 +10:00
..
deploy.md Deploy-ready: path-prefix hosting (digalot.fyi/festifun) + deploy artifacts 2026-07-16 13:20:36 +10:00
foundation2.md foundation2 (phase 5a): contracts, stubs, hooks & UI wiring for lanes E/F/G 2026-07-17 17:31:08 +10:00
foundation.md status: foundation merged to main (M0 + M3 + frozen contracts) 2026-07-16 00:46:41 +10:00
integration2.md integration2: full synthetic pass of M10-M17 accepted; DIRECTIVES round 5; floor 189 2026-07-17 18:11:56 +10:00
integration.md Integration (M8 + M9): annotation→3D, camera paths, README, v0.1.0 2026-07-16 09:59:51 +10:00
lane-A.md lane A status: M1 complete, ready_to_merge (isolated worktree) 2026-07-16 01:15:23 +10:00
lane-B.md Lane B (M2 + M8 geometry): COLMAP reconstruction, geometry math, graceful degradation 2026-07-16 08:40:46 +10:00
lane-C.md Lane C (M4+M5+M6 + timeline): synchronized viewer frontend 2026-07-16 08:45:51 +10:00
lane-D.md lane D: status -> merged (M7 done, 5c2d7c6; review findings fixed) 2026-07-16 08:38:47 +10:00
lane-E.md Merge main (lane G M16/M17 + CR-4) into lane/e-director2; reconcile CRs 2026-07-17 17:58:22 +10:00
lane-F.md M15: moment FX (lane F) + status file 2026-07-17 17:54:11 +10:00
lane-G.md lane G: status — M16+M17 complete, 169 passed, capsule E2E evidence, CR-4 noted 2026-07-17 17:51:33 +10:00
phase4.md Phase 4 polish: anchor supersede + delete, docs/ideas, field-test scaffolding 2026-07-16 12:15:35 +10:00
TEMPLATE.md Add coordination loop: run order (DIRECTIVES.md), per-agent status protocol 2026-07-16 00:08:54 +10:00