festifun/plan/status
m3ultra 7c13f519d2 Phase 4 polish: anchor supersede + delete, docs/ideas, field-test scaffolding
Fixes the sole Round-3 wart: annotating one object from two views now yields
ONE anchor (the single-view fallback is superseded in place by the
triangulation, same id) instead of a sibling pair. Adds DELETE /api/anchors/{id}
(unlinks annotations, 404 on unknown) + a deletable anchor list in the
correction panel. db gains get/update/delete_anchor + get_annotations(event_id).
CR-3 filed (additive). Suite 101 -> 103; frontend build clean; delete UI
verified live (state + DOM + 3D scene stay consistent).

Also: docs/ideas.md (future extensions), plan/ISSUES.md (seeded with the
gemini-2.5-flash retirement, FIXED), plan/status/phase4.md.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-16 12:15:35 +10:00
..
foundation.md status: foundation merged to main (M0 + M3 + frozen contracts) 2026-07-16 00:46:41 +10:00
integration.md Integration (M8 + M9): annotation→3D, camera paths, README, v0.1.0 2026-07-16 09:59:51 +10:00
lane-A.md lane A status: M1 complete, ready_to_merge (isolated worktree) 2026-07-16 01:15:23 +10:00
lane-B.md Lane B (M2 + M8 geometry): COLMAP reconstruction, geometry math, graceful degradation 2026-07-16 08:40:46 +10:00
lane-C.md Lane C (M4+M5+M6 + timeline): synchronized viewer frontend 2026-07-16 08:45:51 +10:00
lane-D.md lane D: status -> merged (M7 done, 5c2d7c6; review findings fixed) 2026-07-16 08:38:47 +10:00
phase4.md Phase 4 polish: anchor supersede + delete, docs/ideas, field-test scaffolding 2026-07-16 12:15:35 +10:00
TEMPLATE.md Add coordination loop: run order (DIRECTIVES.md), per-agent status protocol 2026-07-16 00:08:54 +10:00