..
deploy.md
Deploy-ready: path-prefix hosting (digalot.fyi/festifun) + deploy artifacts
2026-07-16 13:20:36 +10:00
foundation2.md
foundation2 (phase 5a): contracts, stubs, hooks & UI wiring for lanes E/F/G
2026-07-17 17:31:08 +10:00
foundation3.md
foundation3 WIP checkpoint (steps 2-5,7): DB/API/CLI/config/capsule + tracker stubs
2026-07-17 20:55:29 +10:00
foundation.md
status: foundation merged to main (M0 + M3 + frozen contracts)
2026-07-16 00:46:41 +10:00
integration2.md
integration2: full synthetic pass of M10-M17 accepted; DIRECTIVES round 5; floor 189
2026-07-17 18:11:56 +10:00
integration.md
Integration (M8 + M9): annotation→3D, camera paths, README, v0.1.0
2026-07-16 09:59:51 +10:00
lane-A.md
lane A status: M1 complete, ready_to_merge (isolated worktree)
2026-07-16 01:15:23 +10:00
lane-B.md
Lane B (M2 + M8 geometry): COLMAP reconstruction, geometry math, graceful degradation
2026-07-16 08:40:46 +10:00
lane-C.md
Lane C (M4+M5+M6 + timeline): synchronized viewer frontend
2026-07-16 08:45:51 +10:00
lane-D.md
lane D: status -> merged (M7 done, 5c2d7c6; review findings fixed)
2026-07-16 08:38:47 +10:00
lane-E.md
Merge main (lane G M16/M17 + CR-4) into lane/e-director2; reconcile CRs
2026-07-17 17:58:22 +10:00
lane-F.md
M15: moment FX (lane F) + status file
2026-07-17 17:54:11 +10:00
lane-G.md
lane G: status — M16+M17 complete, 169 passed, capsule E2E evidence, CR-4 noted
2026-07-17 17:51:33 +10:00
phase4.md
Phase 4 polish: anchor supersede + delete, docs/ideas, field-test scaffolding
2026-07-16 12:15:35 +10:00
TEMPLATE.md
Add coordination loop: run order (DIRECTIVES.md), per-agent status protocol
2026-07-16 00:08:54 +10:00