Commit Graph

2 Commits

Author SHA1 Message Date
type-two
9fdc5d2317 Merge main (lane G M16/M17 + CR-4) into lane/e-director2; reconcile CRs
Conflicts resolved: (a) test_phase5_api.py — with lane G's capsule AND
lane E's features/direct all landed, the CLI stub loop is empty, so
test_cli_dispatches_stubs_gracefully is retired with a pointer comment to
the real dispatch coverage (test_capsule.py / test_audio_features.py /
test_director.py); (b) CHANGE_REQUESTS.md — lane G keeps the ratified
CR-4; lane E's entry renumbered to CR-5 and updated for the merged
reality. Merged tree: 189 passed (169 main + 21 lane E - 1 retired),
frontend build clean.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-17 17:58:22 +10:00
type-two
369c559b1e lane E status: M10-M12 ready_to_merge (148 passed; CR-4 filed)
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-17 17:54:41 +10:00