Commit Graph

4 Commits

Author SHA1 Message Date
type-two
56e569fd7a Plan: Phase 6 spec + directives round 6 (M18-M24 Friend Tracks, lanes H/J/K)
Markers/badges -> detection -> cross-view triangulation -> track ribbons +
follow-a-friend + LED badge hardware kit. Coordinator-merges policy this phase.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-17 18:28:21 +10:00
m3ultra
545f7a347d Plan: Phase 5 spec + directives round 4 (M10-M17, lanes E/F/G)
plan/20-phase5.md is the phase-5 canonical spec: M10 beats/onsets,
M11 auto-director, M12 cinematic export (lane E); M13 anchor manager +
friend tags, M14 photo mode, M15 moment FX (lane F); M16 server-side
camera paths, M17 static memory-capsule export (lane G). foundation2
freezes the new contracts (beats.json, camPath JSON, paths table,
PATCH anchors, __F4D_API_BASE__ / manifest.capsule, transport/scene3d
hooks) and pre-wires all UI so parallel lanes never touch shared files.

DIRECTIVES Round 4 records the fresh-eyes upgrades (FFT caching,
WebAudio master clock, spatial audio; suite floor now 121), ratifies
the additive contract amendments, and sets run order:
foundation2 -> E, G, F (own worktrees, mandatory) -> integration2
(real-footage field test, v0.2.0 proposal).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-17 17:08:44 +10:00
m3ultra
47bec93bc5 Add coordination loop: run order (DIRECTIVES.md), per-agent status protocol
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-16 00:08:54 +10:00
m3ultra
e31e8ac559 Festival 4D build spec + parallel lane plan for Opus agents
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-16 00:06:54 +10:00