TURNCRAFT/docs
jing f88be60e60 Integrate all five lanes: wire main.ts, fix record height contract, verify live
- src/main.ts: full wiring per docs/INTEGRATION.md (renderer/world/booth/
  chunks/machines/player/interaction/audio/fx/hud + fixed-step loop),
  QuestPositions adapter (Lane C nested -> Lane D flat), attachPlayer step,
  pointer-lock-gated input, debug handle for smoke tests.
- core/constants: Y_RECORD_TOP 85 -> 81 (record was an unclimbable 5-voxel
  cliff; now 1 proud of the plinth, auto-steppable) + PLATTER.wellDepth.
- machines/platter: body + collider now fill Lane C's well down to y=74.
- fx/layout: VU sprites aligned to Lane C's physical LED towers.
- interact: per-material break times (dust 0.12s) so the crossfader jam
  isn't a 96-second mine.
- docs/INTEGRATION_NOTES.md: every glue decision + live verification results
  (120 fps, ride/mine/quest/win all green, zero console errors).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-13 21:11:10 +10:00
..
briefs TURNCRAFT: contracts, docs, and all five lane deliverables (pre-integration) 2026-07-13 20:50:56 +10:00
CONTRACTS.md TURNCRAFT: contracts, docs, and all five lane deliverables (pre-integration) 2026-07-13 20:50:56 +10:00
DESIGN.md Integrate all five lanes: wire main.ts, fix record height contract, verify live 2026-07-13 21:11:10 +10:00
INTEGRATION_NOTES.md Integrate all five lanes: wire main.ts, fix record height contract, verify live 2026-07-13 21:11:10 +10:00
INTEGRATION.md TURNCRAFT: contracts, docs, and all five lane deliverables (pre-integration) 2026-07-13 20:50:56 +10:00
LANE_A_update.md TURNCRAFT: contracts, docs, and all five lane deliverables (pre-integration) 2026-07-13 20:50:56 +10:00
LANE_C_update.md TURNCRAFT: contracts, docs, and all five lane deliverables (pre-integration) 2026-07-13 20:50:56 +10:00
LANE_D_update.md TURNCRAFT: contracts, docs, and all five lane deliverables (pre-integration) 2026-07-13 20:50:56 +10:00
LANE_E_update.md TURNCRAFT: contracts, docs, and all five lane deliverables (pre-integration) 2026-07-13 20:50:56 +10:00
UPDATE_B.md TURNCRAFT: contracts, docs, and all five lane deliverables (pre-integration) 2026-07-13 20:50:56 +10:00