TURNCRAFT/docs/progress-cutoff/pcb_fuse_after.jpg
jing 9c668d340c Headshell Workshop + Glow-Up phase: assembly minigame, art pass, review fixes
- Workshop (WORKSHOP_CARTRIDGE): five-stage cartridge assembly at Deck A —
  seat/square, crimp four tag-wires, torque screws, ride-the-arm counterweight
  balance, needle-drop diagnostic with per-fault audio + scope. Relay-synced
  (per-field co-op merge: held screw + carried wire survive remote state).
- Glow-Up (G1-G5): 32px atlas with per-voxel variants, selective LED bloom
  (quality-gated), screen-print decal system + party flyers, mixer/PCB worldgen
  density pass, record groove-sheen side texture.
- 10 confirmed multi-agent review fixes, incl. co-op screw-stomp soft-lock,
  ride-snap collider-identity (magnet feet / eaten record-fling), workshop SFX
  exact-match map (rca_seated hijack), beam ride colliders to the head,
  double-crimp guard, WIRING INCOMPLETE diagnosis mode, skate-abort timer,
  completedState wiring, per-tick material churn, trackingHeavy platter drag.
- Crossfader playtest fix: slew-limited sled (3.4 v/s) + ribbed grip caps with
  amber index — the sled reads as a heavy handle, not a teleporting wall.
- Demo harnesses: machinesDemo hold-key wiring, playerDemo seesaw phase
  continuity, audioDemo incomplete fault button.
- Workshop sync: exact 1.0 screw endpoint gets its own emit signature.

Verified: typecheck + vite build clean, live solo quest smoke, two-client
co-op relay smoke (simultaneous torque, no rewind, exact convergence).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-14 21:32:07 +10:00

41 KiB
640x360px