TURNCRAFT/docs
jing 49cab1f69b Concept-art pass: terraced records, spindle towers, warm lit room
- Records are stepped groove amphitheaters (3 vinyl tiers + 4-tier spindle
  tower, stacked rotating cylinder colliders) - you climb a spinning
  staircase. Tonearm clearances raised to match.
- Player physics: cylinder contacts resolve by minimum penetration (fixes a
  latent radial-slingshot bug), collider lips auto-step like voxel ledges,
  rim-standing radius grace.
- Well seam ring raised (was a 7-deep inescapable trench, now a 1-step
  Technics seam).
- Plywood ceiling with amber lamp panels + warm point lights; brighter warm
  lighting rig; colorful mixer knob caps; rim-crumble debris.
- window.TURNCRAFT_CINE camera override for screenshots/trailers.

Verified live: rim->plateau spiral climb at 33rpm, tower climb 83->87,
seam escape, quest/win chain, 121 fps.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-13 21:48:00 +10:00
..
briefs TURNCRAFT: contracts, docs, and all five lane deliverables (pre-integration) 2026-07-13 20:50:56 +10:00
CONTRACTS.md TURNCRAFT: contracts, docs, and all five lane deliverables (pre-integration) 2026-07-13 20:50:56 +10:00
DESIGN.md Integrate all five lanes: wire main.ts, fix record height contract, verify live 2026-07-13 21:11:10 +10:00
INTEGRATION_NOTES.md Concept-art pass: terraced records, spindle towers, warm lit room 2026-07-13 21:48:00 +10:00
INTEGRATION.md TURNCRAFT: contracts, docs, and all five lane deliverables (pre-integration) 2026-07-13 20:50:56 +10:00
LANE_A_update.md TURNCRAFT: contracts, docs, and all five lane deliverables (pre-integration) 2026-07-13 20:50:56 +10:00
LANE_C_update.md TURNCRAFT: contracts, docs, and all five lane deliverables (pre-integration) 2026-07-13 20:50:56 +10:00
LANE_D_update.md TURNCRAFT: contracts, docs, and all five lane deliverables (pre-integration) 2026-07-13 20:50:56 +10:00
LANE_E_update.md TURNCRAFT: contracts, docs, and all five lane deliverables (pre-integration) 2026-07-13 20:50:56 +10:00
UPDATE_B.md TURNCRAFT: contracts, docs, and all five lane deliverables (pre-integration) 2026-07-13 20:50:56 +10:00