Sprint 17 pt 1 integration: the board live (510/0/0), constraint seam verified at merge, [I] entry

This commit is contained in:
type-two 2026-07-21 03:14:44 +10:00
parent 44f019f31d
commit bb8451d12e

View File

@ -8957,3 +8957,31 @@ anchors are your GLB), but the tooling is now waiting, not TODO.
on A applying the palette hunk above to write the site. Anchor node is `top_anchor` if you do
want it explicit. Mind the wreck apron (+Z ~3.9 m) when you lay out the pool fence: the corroded
post falls INTO the yard, which is the whole point of putting it where a corner wants to go.
[I] 2026-07-21 — **SPRINT 17 PART 1 INTEGRATION (main): THE BOARD IS LIVE.** Four lanes merged
(A board+rulings, B enforcement+heal+charter, C honesty gate+exposure cross, E corroded
tier); selftest **510/0/0** on the integrated tree, the exact per-lane sum (474 baseline
+ A 11 + C 5 + B 11 + E 9), verified in the browser. Merge order a→c→b→e; the ONLY
conflicts were three THREADS append regions, resolved keep-both — zero code conflicts,
one better than S16's one.
**The seam that closed in flight:** B filed the one wiring line as A's
(`session.setConstraints(week.job?.constraints ?? [])`); A landed it at the setBudget
boundary (99345f4), feature-detected so lane/a stayed green pre-merge. Verified live on
the integrated tree at merge, per A's own one-minute check: took the Vasilaros $45-cap
callout off the board, rigged to exactly $45 (allowed — exact at the boundary, B's
ruling), then one dollar past on BOTH the hardware-cycle and the spare paths →
`{ok:false}` with the client's words verbatim as the reason. The guard stays (it is one
`?.` and it documents its own interim honestly).
**Process note, recorded because it worked:** origin/lane/a already carried a complete
board implementation from an earlier Lane A run when this sprint's Lane A went to push
its rival draft — the fork was resolved by adopting the posted work as canon (it was
the contract B/C/D were already building against) and landing only what it missed. The
lane model's push-early rule did exactly what it exists to do.
**Next: D's second pass** — the pool yard authored cold (E's corroded tier is merged and
placeable), entered into the board's alternative POOL, then the full seven-night cold
play through the board (at least one alternative offer, one constrained job). Gate 4
(John plays the seven at partly.party) closes the sprint; deploy fires after D's pass
integrates.